Here is the Go Between Bridge. It's a 4-lane toll bridge linking South Brisbane with Coronation Drive with free cycling and walking paths and it opens today. I'm not a big fan of it. I don't think it will reduce traffic much and I think the design is boring. There. I've said my piece.
(Apologies for the soap-box moment)
Subscribe to:
Post Comments (Atom)
7 comments:
Love the name of this bridge.
I think it has taken "bland" to new heights! I'm looking at the bridge on my blog on Wednesday.
I like the perspective of your picture. It's hard not to like the bridge, based on just this image!
I am in Brisbane, Thanks for the image. I will have to go and have a look at this Monstrosity myself
how are the cycling and pedestrian areas demarcated?
There are 2 paths, one on either side of the main road. One is for cyclists and the other for pedestrians. The one that you can see in the picture is the city-side path which is for pedestrians and the one on the Toowong side is a 3.6 metre bike path.
I'm sure my fellow cyclist will disagree!
Post a Comment